A complete build log – the things that went well, the mistakes that were made, and all the lessons learned along the way.
Complete
0
%
Build Time
0
hrs
Build Cost
$
0
Milestones
Fuselage and Tail
- Become proficient at welding
- Design and build fuselage weld jig
- Weld Fuselage Side Walls
- Fuselage Bulkheads
- Horizontal Stabilizer
- Vertical Stabilizer
- Elevator and Rudder
- Doors
- Fabric Covering
Wing
- Wing Rib Jig Fabrication
- Wing Ribs
- Spars
- Rib/Spar bonding
- Instrumentation and Electrical Routing
- Plywood Covering
- Ailerons
- Flaps
- Glassing
- Mate to Fuselage
- Struts
Control System
Avionics
Firewall Fwd
- Landing Gear
- Elevator Control System
- Rudder Control System
- Ailerons Control System
- Flaps Control System
- Engine Mount Fabrication
- Engine Installation
- Engine Cowling
- Avionics and Control Panel
Testing
- Structural Testing - TBD
- Engine Start
- Low Speed Taxi Testing
- High Speed Taxi Testing
- First Flight
- Phase 1 Flight Testing
- Phase 2 Flight Testing